Hexavalent chromium testing Know if there is chromium 6 in your structure before anyone sands, blasts or demolishes it
Understand the risk
Chromium VI is often hidden in materials you work on every day
Chromium VI compounds are carcinogenic. Under COSHH, exposure must be reduced as low as reasonably practicable. Testing gives you the evidence to plan the work, choose controls and protect your people.
Read the HSE guidance on Chromium VIWhen you may need a test
- Before blasting, sanding or stripping painted steel
- Maintenance on boilers, turbines and hot insulation
- Welding, cutting or hot work on coated metal
- Painted scrap or waste that needs classifying
- Evidence needed for a COSHH assessment or control review
How can we help?

Laboratory analysis
Hard-to-test materials such as zinc paint and insulation, analysed with our patented method. Report within 5 working days.
Submit samples
On-site investigation
Sampling on bridges, ships, plant and buildings by SEEF or IOM, followed by laboratory analysis and reporting.
Request a survey
Projects and advice
Safe working during maintenance, refurbishment and demolition, for asset owners, contractors and consultants.
Book an advice call
Products
Test kits and wipe sample sets for a first indication on site, plus the SEEF Chrome-6 Neutralizer.
Go to the shopOne partner, from sample to control measure
Intake and quote
We discuss your site and materials and agree a fixed price per sample.
Sampling on site
By SEEF or IOM, or by you with our kit. Insulation is sampled in multiple layers.
Quantitative analysis
In our own laboratory, usually within 5 working days. Track every sample online.
Report and advice
Results, interpretation, control measures and waste classification.


Standard methods under-report Chromium VI in zinc-containing paint
Zinc-rich primers and hot-dip galvanised steel often contain 2 to 8% zinc. In those materials, standard methods read far too low. Our patented method (WO2023219493) stabilises Cr(VI) during extraction, so you see what is really there.
How our method works
A laboratory built for Chromium VI
No more under-reporting
Zinc and aluminium in paint can convert Cr(VI) during analysis, so readings come out low. Our method stabilises Cr(VI) during extraction.
Results within 5 working days
Counted from the first working day after your samples arrive. Urgent analysis on request. Follow every sample online.
Paint, insulation, grit, scrap, air and wipes
Analysed with Agilent ICP-MS, GC-MS and UV-VIS. We work in line with ISO/IEC 17025; our accreditation with the Dutch Accreditation Council (RvA) is in progress.
From result to plan
We turn results into remediation plans, specifications, method statements and risk assessment updates, and can support your project through delivery.

Chromium VI found. What now?
A result is only useful when you know what to do with it. These are the questions we answer most often.
Book an advice call- Which control measures fit these results?
- How do I include Cr(VI) in a specification?
- Does our COSHH assessment need updating?
- Have our people been exposed?
- Is this scrap hazardous waste?
- Can Cr(VI) form in our installation?